Quick diagnostic
HUF 135,000 + VAT
list price: HUF 190,000 and up + VAT
- Exterior and interior thermal imaging
- Annotated thermal image catalogue
- A–B–C findings list with HUF/season estimates
- 10–15 page PDF, 45-minute walkthrough
District heating · hot-water pipes
01 / The situation
01
In a closed-loop system the water balance only indicates reliably above roughly 4 m³/h. A smaller leak can go unnoticed for months.
02
If the leak is downstream of the heat meter, the loss appears 1:1 on your bill, including for your own pipe between two buildings.
03
Without a precise location, excavation is a big cost. A surface thermal image narrows the suspect section so less has to be opened up.
02 / What we typically find
Typical items in this type of facility. Which of them exist in your building is what the survey shows: we do not promise defects.
Melted snow, a dry or warm streak above the pipe that may point to wetted insulation.
A longer, uniformly warmer stretch: the insulation is wet and the pipe is giving off heat.
Comparing make-up water consumption with the thermal image so the suspicion can be confirmed.
Covers, shafts and fittings, where heat often escapes.
Missing or damaged insulation on freely routed visible pipes. Here the image is direct.
Thermal condition of the substation and building connections.
03 / Worked example
The example: Leak in a buried pre-insulated hot-water line. 25 m of wetted pre-insulated (PUR) hot line between two buildings (district heat / hot water, 80 C supply). The leak is DOWNSTREAM of the heat meter, so the loss is billed 1:1.
The wetted section loses 200 W/m (100–380 W/m), about 5 kW over 25 m. Make-up water is 19% of the cost (267 m³). A 50 l/h leak is 0.1 m³/h, far below the roughly 4 m³/h detection threshold of a closed-loop water balance, so the balance does not show it.
Energy price basis: non-residential heat fee (the Budapest FŐTÁV tariff as a proxy, not a local tariff) 5,500 / 9,965 / 12,959 Ft/GJ, about 20 / 36 / 47 Ft/kWh; treated make-up water 800 / 1,500 / 2,500 Ft/m³ (assumption). October 2026. We use the figures on your invoice.
Estimate – not a guarantee. Figures are model-based and actual values may differ.
04 / Pilot offer
HUF 135,000 + VAT
list price: HUF 190,000 and up + VAT
HUF 275,000 + VAT
list price: HUF 390,000 and up + VAT
Limited to the first 10 facilities. Quick diagnostic up to 2,000 m², 3D package up to 2,500 m²; travel within 80 km (free up to 40 km). Orders by 31 January 2027, surveys by 31 March 2027, weather permitting.
Our recommendation
For pipe runs we quote a separate item: HUF 60,000 + VAT per started 500 m, minimum HUF 90,000 + VAT. For buildings, the pilot prices are the Quick diagnostic (HUF 135,000) and the 3D package (HUF 275,000). The pipe-run price is a list price.
Same scope and quality as a list-price order. The price does not depend on what you say in the feedback.
05 / How it works
We ask about size, heating or cooling system and energy price. You get a fixed written quote.
We survey in the heating season when the pipe is in operation and the ground surface is out of the sun: at dawn or in the evening. We take both drone and ground-level images and follow the route from your drawings.
PDF report: for each item the location, likely cause, estimated loss with a range, fix suggestion and priority. Raw files and a walkthrough.
06 / Common questions
07 / Honest limits
08 / Get a quote
Tell us the type, location and approximate size of the facility. We reply by the next working day at the latest. The request is for business purposes: we serve companies and organisations.